Sign In | Join Free | My fazendomedia.com
China Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. logo
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
Zhenjiang Tongkai Mechanical Engineering Co.,Ltd. Innovation seeks development and Cooperation wins the future.
Verified Supplier

2 Years

Home > Bailey Bridge >

ZB200 S460J0 BS5400 HA+20HB Extra Wide Heavy Load Anti Skid Aggerates Bailey Bridge Long Span

Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

ZB200 S460J0 BS5400 HA+20HB Extra Wide Heavy Load Anti Skid Aggerates Bailey Bridge Long Span

Brand Name : Tongkai

Model Number : ZB200/TK200/Compact 200

Certification : ISO,EN1090,SGS ,CIDB

Place of Origin : China

MOQ : 1 set

Price : 1500USD ~2000USD/ton

Payment Terms : L/C, T/T, Western Union, MoneyGram

Supply Ability : 3000/month

Delivery Time : 15~45days

Packaging Details : Nude and Steel case

Material : S460J0,S355JR,S355J0,Gr65,Gr50

Load : HA ,HB,HA+20HB,AASHTO HL-93,HS35-44

Lane : Single lane 3.15m~4.2m,Double Lane 7.35m, three lane 10.5m

Surface Finish : Pained or Galvanized

Deck : Anti skid aggerate

Contact Now

PRODUCT DESCRIPTION

ZB 200 Bridge is the ’hot product’ of the TONGKAI modular steel bridge system. The ZB 200 Bridge is the ideal solution for rapid, durable and worthy for permanent or temporary bridging, humanitarian aid and disaster relief operation, replacement of damaged bridge, and provides the flexibility to bridge designers and contractors.

ZB 200 Bridge uses standardized components, or super panel and a selection of decking systems to create a versatile heavy-duty modular steel bridge system with a clear spanning capability of up to 60.96 m (200 ft). The ZB 200 Bridge system combines strong and durable structure with high speed of construction to provide significant advantages over more traditional bridge construction techniques even in the limited access locations such as rural area or disaster stricken area.

APPLICATION

  • Permanent or semi-permanent bridging
  • Long term temporary bridging
  • Rural infrastructure project
  • Urban traffic project
  • Humanitarian aid and disaster relief operation
  • Pedestrian bridging
  • Services pipelines
  • Construction site access
  • Replacement of damaged bridge
  • Emergency response stock

Features

  • Modular
  • Rapid-build
  • Can be assembled using light plant
  • Can be crane built or cantilever launched
  • Relocatable
  • Transport in standard containers
  • Long span capability
  • Single and multi-span solutions available
  • Robust
  • High fatigue capability
  • Heavy axle / Wheel load capacity
  • Long life with minimal maintenance
  • Optional ramps, footwalks, piers, parapets and barriers
  • Various deck options available

Technical Specification

Span

9.144m upto 60.96m

Road Width

single lane 3.15m/4.2m ; double lane 7.35m

Material Grade S460J0,S355JR,GR65,GR50
Load Capacity HL-93,HS25-44, HA ,HA+20HB
Surface Finish Painted or Galvanized
Joint System Pin and Bolt System
Erection Method

Crane lifting , Cantilever Launching Method

ZB200 S460J0 BS5400 HA+20HB Extra Wide Heavy Load Anti Skid Aggerates Bailey Bridge Long Span ZB200 S460J0 BS5400 HA+20HB Extra Wide Heavy Load Anti Skid Aggerates Bailey Bridge Long Span


Product Tags:

ZB200 Bailey Bridge

      

S460J0 Bailey Bridge

      

BS5400 steel bailey bridge

      
Best ZB200 S460J0 BS5400 HA+20HB Extra Wide Heavy Load Anti Skid Aggerates Bailey Bridge Long Span wholesale

ZB200 S460J0 BS5400 HA+20HB Extra Wide Heavy Load Anti Skid Aggerates Bailey Bridge Long Span Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)